DN1200 Storm Water Reline, Maitland NSW

Storm Water Pipe Reline in Maitland NSW

The team delivered one of the most challenging relines of a twin cell 1200mm storm water asset in Maitland in September and November 2015. The Wilmot Team broke boundaries with a daring 1200mm reline of aluminium culverts that had been identified as structurally compromised in a roundabout construction in Maitland.

The Wilmot team traversed the 1200mm culverts up to 110 meters to install the 80 meters of liners to strengthen the pipelines for the construction of the roundabouts above. The team delivered the structural reline on time and within budget. Safety was the number one priority as always and the confined space entry crew delivered big time.