DN150 Sewer Reline, November 2018, Newcastle CBD

The team delivered a tricky reline on a live reticulation sewer main with a combination of by-passing and plug and release methods to install liners to the sewer main which was blocking up regularly due to the old cast iron pipeline failing with large corrosive deposits. The team used the robotic crawler cutting technology to grind and cut out the intrusions and clean the line in preparation for the relining.

The lines installed by Wilmot Pipelining have eliminated the constant blockages with a fully functional sewer main.

No Comments

Post A Comment
Call: 1300 942 028